You don't have javascript enabled. Good luck with that.
Pencarian
Normalisasi saluran di Jalan A Karang Anyar

Channel Normalization in Karang Anyar to Complete October

As many as 12 personnel of Central Jakarta Water Resources were deployed to normalize water channel on Jalan A Gang A4 RT 04/04, Karang Anyar, Sawah Besar.

the progress reaches 45 percent

Sawah Besar District's Head of Water Resources, Yusuf Sumardani said the normalization of the 120-meter-long channel follows up on residents' proposals submitted through the RW deliberation and Musrenbang stages.

"The work has been running since August by by dismantling the channel and installing a concrete u-ditch measuring 40 cm wide and 50 to 65 centimeters high," he said, Monday (9/22).

Channel on Jalan Gunung Sahari Dredged from Mud

According to him, this channel normalization is to overcome the problem of flooding that often occurs in the area when heavy rain falls.

"Now the progress reaches 45 percent and is targeted to complete in October," he added.

Meanwhile, Margono (46), one of local residents, appreciated the personnel for quickly responding residents' proposal.

"Hopefully the channel will flow the water smoothly after being normalized," he admitted.

Linked News
Popular News indeks
  1. Temporary Crosswalk to Be Built at Tendean Pedestrian Bridge Site

    access_time18-07-2026 remove_red_eye1762 personFakhrizal Fakhri
  2. China-Based Training Equips PR Professionals and Journalists for Digital Media Transformation

    access_time19-07-2026 remove_red_eye1489 personFakhrizal Fakhri
  3. Rano Challenges Jakarta Provoke Organizers to Hold Exhibition Along Sudirman-Thamrin

    access_time18-07-2026 remove_red_eye1076 personBudhi Firmansyah Surapati
  4. Jakarta Supports Social Media Restrictions for Children

    access_time20-07-2026 remove_red_eye1070 personFakhrizal Fakhri
  5. Gas Stove Leak Sparks Fire, Gutting Five Rented Houses on Jalan Kayu Tinggi

    access_time17-07-2026 remove_red_eye986 personNurito